Draft solution of primary crushing at limestone and stone aggregates processing plant from deposit 'Suvodo' A.D. – Jelen Do
Abstract
This paper gives a presentation of primary crushing at stone aggregates production plant from deposit "Suvodo". The paper has been developed from The Main Mining Project of the new processing plant for limestone and production of stone aggregates from deposit "Suvodo"-A.D.- Jelen Do. First problem to be solved at primary crushing was the removal of waste rock being occurred in the useful component by mining. This one together with other problems has been solved in the laboratories of ITNMS and further on, at the operating plant itself.
Keywords:
waste / primary crushing / limestone / aggregatesSource:
Journal of Mining and Metallurgy A: Mining, 2006, 42, 1, 15-27Publisher:
- Univerzitet u Beogradu - Tehnički fakultet u Boru, Beograd
Collections
Institution/Community
Institut za tehnologiju nuklearnih i drugih mineralnih sirovinaTY - JOUR AU - Radulović, Dragan AU - Antanasković, Velimir AU - Ivošević, Branislav AU - Mihajlović, Slavica PY - 2006 UR - https://ritnms.itnms.ac.rs/handle/123456789/92 AB - This paper gives a presentation of primary crushing at stone aggregates production plant from deposit "Suvodo". The paper has been developed from The Main Mining Project of the new processing plant for limestone and production of stone aggregates from deposit "Suvodo"-A.D.- Jelen Do. First problem to be solved at primary crushing was the removal of waste rock being occurred in the useful component by mining. This one together with other problems has been solved in the laboratories of ITNMS and further on, at the operating plant itself. PB - Univerzitet u Beogradu - Tehnički fakultet u Boru, Beograd T2 - Journal of Mining and Metallurgy A: Mining T1 - Draft solution of primary crushing at limestone and stone aggregates processing plant from deposit 'Suvodo' A.D. – Jelen Do EP - 27 IS - 1 SP - 15 VL - 42 UR - conv_333 ER -
@article{ author = "Radulović, Dragan and Antanasković, Velimir and Ivošević, Branislav and Mihajlović, Slavica", year = "2006", abstract = "This paper gives a presentation of primary crushing at stone aggregates production plant from deposit "Suvodo". The paper has been developed from The Main Mining Project of the new processing plant for limestone and production of stone aggregates from deposit "Suvodo"-A.D.- Jelen Do. First problem to be solved at primary crushing was the removal of waste rock being occurred in the useful component by mining. This one together with other problems has been solved in the laboratories of ITNMS and further on, at the operating plant itself.", publisher = "Univerzitet u Beogradu - Tehnički fakultet u Boru, Beograd", journal = "Journal of Mining and Metallurgy A: Mining", title = "Draft solution of primary crushing at limestone and stone aggregates processing plant from deposit 'Suvodo' A.D. – Jelen Do", pages = "27-15", number = "1", volume = "42", url = "conv_333" }
Radulović, D., Antanasković, V., Ivošević, B.,& Mihajlović, S.. (2006). Draft solution of primary crushing at limestone and stone aggregates processing plant from deposit 'Suvodo' A.D. – Jelen Do. in Journal of Mining and Metallurgy A: Mining Univerzitet u Beogradu - Tehnički fakultet u Boru, Beograd., 42(1), 15-27. conv_333
Radulović D, Antanasković V, Ivošević B, Mihajlović S. Draft solution of primary crushing at limestone and stone aggregates processing plant from deposit 'Suvodo' A.D. – Jelen Do. in Journal of Mining and Metallurgy A: Mining. 2006;42(1):15-27. conv_333 .
Radulović, Dragan, Antanasković, Velimir, Ivošević, Branislav, Mihajlović, Slavica, "Draft solution of primary crushing at limestone and stone aggregates processing plant from deposit 'Suvodo' A.D. – Jelen Do" in Journal of Mining and Metallurgy A: Mining, 42, no. 1 (2006):15-27, conv_333 .